SPEC SHORTS – (Vol. 2) Issue 20 – May 21, 2025

“Wait… all of this is contained in Division 01?”

In this week’s SPEC SHORTS, we continue our 3-part mini series with Part 2: an inside look at General Requirements (Division 01)—the central hub of a Tender-ready Specification.

Professor V works with his client to unpack how Division 01 acts as the link between legal expectations (Division 00) and technical trade Sections (Divisions 02–49), while removing duplication and reducing the risk of conflicting requirements buried within multiple sections.

Division 01 houses the content that applies to every trade Section, including:

  • Summary of Work
  • Allowances
  • Substitution Procedures
  • Submittal Procedures
  • Sustainable Design Requirements
  • Quality Assurance & Mock-ups
  • Temporary Utilities, Facilities & Construction
  • Closeout Submittals, and
  • Warranty Guidelines

“Think of Division 01 as the Project Manual’s control panel. Without it, you’re just flipping switches in the dark!”